Numerical analysis for the study of interference between the construction of a new hospital pavilion and the Lamba Doria gallery
When new construction is planned, it is important to study the effect that this has on existing works. This is the case of the new Pavilion 0 of the Giannina Gaslini Institute in Genoa, which will be built at the Lamba Doria double-track tunnel on the Genoa-Pisa line. For this reason, Geosolving has developed two-dimensional Read more about Numerical analysis for the study of interference between the construction of a new hospital pavilion and the Lamba Doria gallery[…]