Monitoring during pipe-jacking: why not?

To allow for safe construction of a sewer system by pipe-jacking close to residential houses in Foglizzo (To), Geosolving has put in place a simple, economic but sound monitoring plan. By installing inclinometers on the buildings next to the excavation and thanks to a wireless data logger, it was possible to continuously monitor the performance of the buildings during the excavation phases so to allow for regular activities at the construction site together with assuring safe conditions to residents.

More information here: Works.

Leave a Reply

Your email address will not be published. Required fields are marked *